595d1fe0fd10f71e767e1a05fb415d0877320c32
design-system.md was still describing a mid-Phase-5 state (charting, dashboard panels, query/search, and alerting UI all listed as "not built yet"); added sections for all of them plus a real Accessibility section, and fixed color-token values that had drifted from the actual tokens.css since the contrast fixes. phase-5-runbook.md documents what was actually verified against a live docker-compose stack with real seeded data, including the five real bugs that live-verification caught -- two of them backend bugs with no connection to the frontend redesign, only surfaced because getting real dashboard/alert data required exercising write paths nothing had exercised since Phase 4's tenant_id migrations landed. CLAUDE.md gets Phase 5's exit criteria, matching every prior phase's "what done looks like" section.
Description
Imported from github.com during the 2026-09-20 standup (local dir: cairnobs)
2.1 MiB
Languages
Go
72.5%
Svelte
12.1%
Rust
8%
TypeScript
4%
Shell
1.3%
Other
2%