Specs: a draft runbook for the cutover
Steps 1 to 3 of SPEC §7 are met, so the remaining one is running the fork as the mail server. The draft covers the sequence on the host, what to check before letting mail flow, and what to watch in the first week. Two things it refuses to gloss: rolling back stops being a snapshot restore the moment the fork accepts a message, because nobody has tested whether the Enterprise build reads a store the fork has written; and certificate renewal is the failure that arrives 90 days late and quietly, on the one path the suites couldn't settle. Nothing in it has been rehearsed. The rehearsal on a copy is step 2 of "Before the day", and it is what turns "the data opens" into "the server runs on it".
This commit is contained in:
+1
-1
@@ -544,7 +544,7 @@ Steps 1 to 3 are met as of 2026-09-19: the fork builds and its suites pass
|
||||
(`container-tests.md`), and all eight compat tests pass against a copy of
|
||||
INBUXA's store, with the caveat that two of them have nothing to read and
|
||||
the tenant administrators' own view is not yet recorded
|
||||
(`compat-tests.md`). What remains is step 4.
|
||||
(`compat-tests.md`). What remains is step 4, drafted as `cutover.md`.
|
||||
5. Only then: public repository and announcement, with the INBUXA fork of
|
||||
ihasmail released alongside. Public ihasmail stays Stalwart-facing (§5).
|
||||
|
||||
|
||||
Reference in New Issue
Block a user