1 Commits
Author SHA1 Message Date
jcoffey-dev 595d1fe0fd Document Phase 5: finalize design-system.md, add runbook, exit criteria
design-system.md was still describing a mid-Phase-5 state (charting,
dashboard panels, query/search, and alerting UI all listed as "not
built yet"); added sections for all of them plus a real Accessibility
section, and fixed color-token values that had drifted from the actual
tokens.css since the contrast fixes.

phase-5-runbook.md documents what was actually verified against a live
docker-compose stack with real seeded data, including the five real
bugs that live-verification caught -- two of them backend bugs with no
connection to the frontend redesign, only surfaced because getting
real dashboard/alert data required exercising write paths nothing had
exercised since Phase 4's tenant_id migrations landed.

CLAUDE.md gets Phase 5's exit criteria, matching every prior phase's
"what done looks like" section.
2026-08-16 12:36:31 -07:00